QUESTION: The plan calls for the topsoil respread to be both 4” and 6”. Please confirm.
RESPONSE: 6" restoration for building removal, 4" restoration for everything else.
QUESTION: The plan calls to relocate (2) handholes. Is this something we need to account for?
RESPONSE: Yes, that needs to be accounted for, the handholes are for site electric.
QUESTION: It looks like the watermain is mostly all abandon in place except where we need to remove at the tie-in points. Is that correct? Or does more than that need to be removed?
RESPONSE: Yes, that is correct. Most of the watermain will be abandoned in place except at the tie-in points.
QUESTION: I see details for erosion control, but none on the plan. Please confirm
RESPONSE: See the addendum posted on Friday July 18th, erosion control devices were included on that.
QUESTION: Do we need to include private utility locating?
RESPONSE: Private utility locating is not required by the contractor.
QUESTION: The bid form asks for a undercutting unit price per square yard, but no depth to define it. Can a depth be associated or it be changed to cubic yard?
RESPONSE: Price the undercutting per square yard per 1 foot depth.
FRIDAY JULY 18, 2025
10:30AM
UPDATED BID DUE DATE CHANGE TO THURSDAY JULY 31, 2025 AT 2:00PM
ADDED DOCUMENTS ON BID WEBSITE:
VENDOR CERTIFICATION FORM
IMEG ADDENDUM ACKNOWLEDGEMENT FORM
QUESTION: Can you please tell me if there is any electrical required on this project? I do not see any electrical drawings.
RESPONSE: YES, ADDITIONAL ELECTRIC DRAWINGS WILL PROVIDED AT THE PRE-BID MEETING ON JULY 31 AND POSTED TO THE WEBSITE BY 5:00PM
QUESTION: I am inquiring to ask if there is a construction cost estimate or budget associated with the Water System and Parking Lot Improvements Project.
RESPONSE: The project is expected to be $425K-$500K RANGE.