Lake County Addendum Forum

Bid 25267 LCHD Water system and Parking lot improvements

ADDENDUM

ADDENDUM BID  25267

 

FINAL

TUESDAY July 22, 2025

2:00PM

 

QUESTION: The plan calls for the topsoil respread to be both 4” and 6”.  Please confirm.

RESPONSE: 6" restoration for building removal, 4" restoration for everything else. 

QUESTION: The plan calls to relocate (2) handholes.  Is this something we need to account for?

RESPONSE: Yes, that needs to be accounted for, the handholes are for site electric.

QUESTION: It looks like the watermain is mostly all abandon in place except where we need to remove at the tie-in points.  Is that correct?  Or does more than that need to be removed?

RESPONSE: Yes, that is correct. Most of the watermain will be abandoned in place except at the tie-in points. 

 QUESTION: I see details for erosion control, but none on the plan.  Please confirm

RESPONSE: See the addendum posted on Friday July 18th, erosion control devices were included on that. 

 QUESTION: Do we need to include private utility locating?

RESPONSE: Private utility locating is not required by the contractor.

 QUESTION: The bid form asks for a undercutting unit price per square yard, but no depth to define it.  Can a depth be associated or it be changed to cubic yard?

RESPONSE: Price the undercutting per square yard per 1 foot depth. 

 

FRIDAY JULY 18, 2025

10:30AM

UPDATED BID DUE DATE CHANGE TO THURSDAY JULY 31, 2025 AT 2:00PM

ADDED DOCUMENTS ON BID WEBSITE: 

VENDOR CERTIFICATION FORM

IMEG ADDENDUM ACKNOWLEDGEMENT FORM  

QUESTION: Can you please tell me if there is any electrical required on this project? I do not see any electrical drawings.

RESPONSE: YES, ADDITIONAL ELECTRIC DRAWINGS WILL PROVIDED AT THE PRE-BID MEETING ON JULY 31 AND POSTED TO THE WEBSITE BY 5:00PM 

QUESTION: I am inquiring to ask if there is a construction cost estimate or budget associated with the Water System and Parking Lot Improvements Project.

RESPONSE: The project is expected to be $425K-$500K RANGE.